Proof that operational readiness can be predictable

The last mile of every project is where delays, rework, and risk compound. See how leading owners, contractors, and operators use Exto to bring clarity, control, and confidence to commissioning, quality, and handover.

3K+
Assets per Site (avg)
10,000+
Active Users
20
Global Clients
15
Platform Modules
10+
Platform Integrations
$50B+
In Capital Projects
30%
Faster Checklist Completion
60%
Reduction in Issue Resolution
75%
Fewer FAT Execution Errors
~30
Days Saved Per Site/Year
$250K+
Labor Savings Per Site
$3M+
Lifecycle Savings/Year
3K+
Assets per Site (avg)
10,000+
Active Users
20
Global Clients
15
Platform Modules
10+
Platform Integrations
$50B+
In Capital Projects
30%
Faster Checklist Completion
60%
Reduction in Issue Resolution
75%
Fewer FAT Execution Errors
~30
Days Saved Per Site/Year
$250K+
Labor Savings Per Site
$3M+
Lifecycle Savings/Year
CASE STUDY — SEMICONDUCTOR

A Global Semiconductor Leader — Transforming Mission-Critical Commissioning

The client faced an urgent crisis when Oracle announced End-of-Life for Latista — their legacy commissioning platform — with just 90 days’ notice. The fallout exposed years of compounding operational debt across 11 global sites. Exto deployed an enterprise-grade, cloud-native platform purpose-built for mission-critical commissioning — a single source of truth connecting the client, 25+ GCs, and 500+ Subs with role-based security.

$250K
Saved Per Site / Year
60%
Faster Commissioning
75%
Fewer FAT Errors
~7,000
Active Users
Semiconductor fabrication plant commissioning
CASE STUDY — INFRASTRUCTURE

Digitizing ITP-Driven QA/QC Across Construction & Installation

A large metro rail program faced extraordinary complexity — thousands of assets across multiple disciplines, contractors executing in parallel, high regulatory oversight, and handover requirements demanding complete, traceable evidence. Exto was implemented as the system of record for QA/QC execution — operationalizing Inspection & Test Plans as the backbone of quality execution, not static reference documents.

2,261+
Active Assets Tracked
Contractor Growth
25+
Monthly Observations
~2wk
Deficiency Closure
Metro rail infrastructure commissioning project
CASE STUDY — DATA CENTER

Hyperscale Data Center Campus — Digital Commissioning Transformation

Commissioning a hyperscale data center requires precise coordination across thousands of interconnected electrical and mechanical assets. Haskell implemented Exto to digitize commissioning execution — creating a structured, scalable asset management framework and a single source of truth across all systems and zones, with 9,000+ equipment assets digitally tracked from installation through turnover.

9,000+
Assets Tracked
20
Live Dashboards
30-40%
Rework Reduction
15-25%
Productivity Gain
Hyperscale data center commissioning

The No. 1 Operational Readiness Platform in the World.

Your Industry. Your Complexity. Our Platform.

See how Exto accelerates your commissioning, reduces defects, and gets your facility operational on time.

We’re here to help and answer your questions.

Get your project ready for startup

Our Location

USA
4030 Moorpark Ave. San Jose, CA 95117

Email

sales@exto360.com

©Exto 2026. All rights reserved.

Download Case Study

Get the full case study with detailed outcomes, implementation insights, and ROI analysis.

Your case study is ready!

Click below to download. We’ve also sent a copy to your email.

Download PDF